This is the version exactly as it was saved, character for character. The SHA-256 hash below is a 64-character code worked out from that text. Run the same text through SHA-256 and you get the same code; change a single letter and the code comes out completely different. Each version also stores the previous version’s hash, which chains them together so no version can be swapped out quietly.

TRUVACE RECORD VERSION
record: TRV-2026-2599
version: 1
kind: certified
reason: Certified into the record
timestamp: 2026-11-12T08:00:42.081291Z
status: published
lens: p_space
sector: climate
headline: Impacts of data center expansion on global energy demand: Sustainability challenges in the age of artificial intelligence
dek: Digital transformation and advances in artificial intelligence have driven the expansion of data centers and increased their share of global electricity demand. This article analyzes the impacts of this growth on power systems and discusses the main challenges to the sector's sustainability. The study adopts a qualitative, exploratory, and descriptive approach and was conducted through a bibliographic and documentary review of 18 sources published between 2019 and 2025. Technical reports, standards, regulatory a…
gain_title: (none)
problem_title: A review of 18 reports and standards found that data centers, AI and crypto could use 620 to 1,050 TWh of electricity in 2026 (up from about 460 TWh in 2022), and that they can be built faster than grids can expand.
trace_subject: (none)
gain_reading: (none)
gain_evidence: (none)
problem_reading: A review of 18 reports and standards found that data centers, AI and crypto could use 620 to 1,050 TWh of electricity in 2026 (up from about 460 TWh in 2022), and that they can be built faster than grids can expand.
problem_evidence: global electricity demand associated with data centers, artificial intelligence, and cryptocurrencies may reach between 620 and 1,050 TWh in 2026
quick_read: A review of 18 technical reports, standards and regulatory documents published between 2019 and 2025 concludes that electricity demand from data centers, AI and cryptocurrencies could reach between 620 and 1,050 TWh in 2026. The International Energy Agency reference scenario is about 800 TWh, against roughly 460 TWh recorded in 2022, an increase of 160 to 590 TWh in four years.

The authors argue the strain comes less from the global total than from rapid expansion, geographic concentration, round-the-clock supply needs and mismatched building timelines. More than 8,000 data centers operate worldwide, about 33% in the United States, 16% in Europe and 10% in China. In Ireland, data centers took about 17% of national electricity demand in 2022, and projections put that near 32% in 2026.

The figures are projections drawn from existing reports, not new measurements. Some companies do not disclose installed capacity, consumption or cooling efficiency, so estimates carry significant uncertainty. The authors say sustainability will depend on locational and energy planning, efficiency, data transparency, coordinated grid expansion and low-carbon sources.
limitation: The findings rest on a review of 18 existing documents and on projections; the authors note that some companies do not disclose detailed consumption data, so estimates carry significant uncertainty.
tag: Evidence-backed problem
key_points: US data center electricity use rose from about 58 TWh in 2014 to 176 TWh in 2023, and Lawrence Berkeley National Laboratory projects 325 to 580 TWh in 2028. | The US share of national electricity use was about 4.4% in 2023 and may reach between 6.7% and 12% in 2028. | China's data centers may use about 300 TWh in 2026 and more than 400 TWh by 2030; EU data centers used about 100 TWh in 2022 and may reach about 150 TWh in 2026. | Brazil's Ministry of Mines and Energy projects 2.5 GW of data center load by 2037 from new projects in São Paulo, Rio Grande do Sul and Ceará alone. | AI chip energy efficiency has doubled roughly every two and a half to three years, but growth in devices, users and applications may outpace those gains. | In some regions, system operators and authorities have restricted or suspended approval of new data centers because of inadequate electricity infrastructure. | Emergency diesel generators used for redundancy add to emissions, and some cooling systems use large volumes of water in water-stressed regions.
rundown: The authors used a qualitative, exploratory and descriptive method, reviewing technical reports, institutional publications, regulatory acts and efficiency standards in Portuguese and English. The sources included the International Energy Agency, Brazil's Ministry of Mines and Energy, Ireland's Commission for Regulation of Utilities, Lawrence Berkeley National Laboratory, ASHRAE, FGV Energia and the European Parliament.

The regional comparison shows different pressure points. The United States and China see the largest absolute growth. Ireland faces risk from the high share of data centers in national demand. The EU is moving on transparency and efficiency rules, including Directive 2023/1791 on disclosure of energy use, water use and emissions. Brazil must plan grid access and reinforcements before loads connect.

On infrastructure, a data center can be built in two to three years while new generation and transmission face longer planning, licensing and financing. The authors say this can create connection queues, regional constraints and reinforcement costs. Data centers also need continuous supply, which makes solar and wind harder to rely on without storage or complementary generation.

The authors say efficiency alone will not cut total demand if processing volumes grow faster. They describe nuclear power as a firm low-carbon option with high upfront costs and long deployment times, and small modular reactors as an emerging option that still depends on technological, regulatory and economic advances.
sources:
- peer_reviewed | World Journal of Advanced Engineering Technology and Sciences | https://doi.org/10.30574/wjaets.2026.20.1.0397 | 2026-07-31
prev: 0000000000000000000000000000000000000000000000000000000000000000
SHA-256 hash
0023103c7b1b0e34200f483cd772c674912382b12ea066cbe7a60d52379a7ef0
Previous version’s hash
0000000000000000000000000000000000000000000000000000000000000000
Check this record hasn’t been altered
How to check it yourself, without trusting this page

Download any version from /api/record/TRV-2026-2599 and hash its canonical field yourself, for example with shasum -a 256. You should get its content_hash. Each version’s text also ends with prev:and the hash of the version before it (version 1 points to 64 zeros). If anyone had changed a single character of any version after it was saved, those hashes wouldn’t line up.